• MEASURE E PROJECTS


    Woodland Star Charter School Parking and Traffic Flow Improvements

    Preconstruction: 2020
    Construction:
    Funding source: Measure E

    Reconfigure the area between Altimira and Woodland star to create better traffic flow for both campuses. More >>




    SVHS Library Renovations

    Preconstruction: 2018
    Construction: Completed
    Funding source: Measure E

    New Carpet, Paint, Furniture and Technology More >>




    Dunbar Elementary School Toilet Room Modernization

    Preconstruction: 2018
    Construction: 2019
    Funding source: Measure E

    Remodel the Kindergarten and the Primary Building Toilet Rooms More >>




    Sassarini Elementary School Site Lighting Replacement and Parking Lighting additions

    Preconstruction: Current
    Construction: Spring 2019
    Funding source: Measure E

    Retrofit existing lighting and add site lighting in parking lot where none occurs More >>




    Dunbar Elementary School Septic System Replacement

    Preconstruction: 2018
    Construction: 2019
    Funding source: Measure E

    More >>




    Creekside High School Creekside Interior Modernization

    Preconstruction: Current
    Construction: Summer 2019
    Funding source: Measure E

    Reconfigure common area inside for better instruction and flow More >>




    Sonoma Charter School Classroom Replacement Phase 1

    Preconstruction: Current
    Construction: Summer 2019
    Funding source: Measure E

    Replace old portable buildings with new modular and portable buildings. More >>




    Dunbar Elementary School Add Sound Mitigation in the Multi Purpose

    Preconstruction: 2019
    Construction: 2019
    Funding source: Measure E

    Add Acoustic Panels in the Multi Purpose More >>




    SVHS Renovate Career Technical Shops and Culinary Classrooms

    Preconstruction: Current
    Construction: 2021
    Funding source: Measure E

    Renovate the Ag, Wood, Metal and Culinary classrooms to provide new 21st Century CTE flexible Classrooms and Shops More >>




    SVHS Athletic Field

    Preconstruction: Current
    Construction: 2021
    Funding source: Measure E

    Renovate the existing baseball and softball fields and include all weather soccer & football field with lights and bleachers. More >>




    Prestwood Elementary School Front Office Modernization

    Preconstruction: Spring 2020
    Construction: 2021
    Funding source: Measure E

    Modernize front office and Staff Support areas to flow and function better More >>




    Sassarini Elementary School Add Running circle around existing fields

    Preconstruction: 2020
    Construction: 2021
    Funding source: Measure E

    More >>




    SVHS Pool

    Preconstruction: Current
    Construction: 2022
    Funding source: Measure E

    Provide Pool and associated storage and support facilities. More >>




    Sassarini Elementary School New Multi-Use Building with Indoor and Outdoor Stage

    Preconstruction: 2020
    Construction: 2023
    Funding source: Measure E

    Replace the existing Multi Purpose Building that will include new kitchen and an indoor/outdoor stage. More >>




    Flowery Elementary School Track and Field improvements

    Preconstruction: 2023
    Construction: 2024
    Funding source: Measure E

    Repair and renovate the track and field with a walking path around it. More >>




    Dunbar Elementary School Reconfigure Library/Comp lab to 21st Century Learning Center

    Preconstruction: 2023
    Construction: 2024
    Funding source: Measure E

    Remodel Library and Computer Lab to a larger multi flexible learning environment with technology. More >>




    Sonoma Charter School Classroom Replacement Phase 2

    Preconstruction: 2023
    Construction: 2024
    Funding source: Measure E

    Replace old portable buildings with new modular and portable buildings. More >>




    Altimira Middle School Altimira all weather Track and Field Improvements

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Create an all weather track and field with lights for fall and winter use. More >>




    El Verano Elementary School New Multi-Use Building & New Drop Off/Parking

    Preconstruction: 2018
    Construction: 2020
    Funding source: Measure E

    Build new Multi Purpose building, move portables and remove old storage buildings. Create new Drop off at east side of campus More >>




    Woodland Star Charter School New Multi-use Building

    Preconstruction: 2020
    Construction: $2,023
    Funding source: Measure E

    New Multi Purpose building with kitchen and toilet rooms More >>




    Woodland Star Charter School New Administration/Classroom Building

    Preconstruction: 2020
    Construction: $2,023
    Funding source: Measure E

    New two story Administration and classroom building More >>




    SVHS Science Wing Modernization

    Preconstruction: 2023
    Construction: 2024
    Funding source: Measure E

    Renovate science building to support technology and 21st century science programs More >>




    Altimira Middle School Covered Lunch Area between Multi Purpose & Gym

    Preconstruction: 2023
    Construction: Fall 2024
    Funding source: Measure E

    Create Covered Lunch Space between MPR and Gym by Demolishing the More >>




    Flowery Elementary School Staff Parking, Multi Purpose and Library Modernization

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Site work to create staff parking with more stalls. Renovate Multi Purpose and add Table Storage Room More >>




    Adele Harrison Middle School Gym Locker Room and Performing Arts Modernization

    Preconstruction: 2018
    Construction: Spring 2020
    Funding source: Measure E

    Modernize the Girls Locker Room and Add Boys Locker Room. Modernize the Dance & Drama Classroom and Band Facilities. More >>